Decoating Furnace: A Procurement Guide by Buyer Type
A decoating furnace is bought to protect metal yield before melting or to restore coating hardware for reuse. This guide matches each buyer type to the decision criteria that keep the furnace clean, compliant and economical.
The furnace you need depends on which side of the decision you sit on. Smelters and canmakers buy continuous decoating before melting; paint shops and cleaning providers buy batch burn-off. This guide sorts the two and fixes the questions that stop a furnace from being specified in a way the site cannot operate.
Find your buyer type
| Buyer type | What you care about most | Commercial trigger |
|---|---|---|
| Secondary smelter / UBC recycler | Burn loss and melt shop stability | High dross and melt loss |
| Roller / can sheet producer | Recycled content and carbon | Recycled content targets |
| Canmaker | Closed-loop UBC recovery | Recycled content commitments |
| Paint shop / coater | Hook and fixture reuse | Hook build-up and replacement cost |
| Thermal cleaning provider | Oven capacity and cycle control | Regional cleaning demand |
The six procurement judgments every decoating buyer must make
- Scenario - continuous decoating before melting, or batch burn-off for coating hardware
- Coating chemistry - paint, lacquer or powder, including any halogen content
- Feed and envelope - tonnes per hour, or part size, weight and temperature limit
- Burn loss target - the metal loss the melt shop can accept
- Energy - whether coating volatiles can be recirculated as fuel
- Off-gas scope - the emission and permit interface the site must meet
Match your criteria to the questions
The question that changes the specification is different in each case. Asking it first keeps competing furnace bids on the same basis and keeps the off-gas from becoming an expensive afterthought.
| Buyer type | Priority criterion | Question to ask suppliers |
|---|---|---|
| Secondary smelter / UBC recycler | Burn loss | What burn loss is your furnace tested against, and how does it stay below my melt shop's limit on my actual feed? |
| Roller / can sheet producer | Throughput and energy | What sustained tonnes per hour does the furnace hold, and how much external energy does it need on my coating load? |
| Canmaker | Closed-loop quality | How clean is the decoated metal entering the melt, and can the route be audited for recycled content? |
| Paint shop / coater | Part protection | How does the cycle stay below my part's temperature limit while still stripping the coating? |
| Thermal cleaning provider | Cycle control | How is the cycle documented and repeated across mixed part batches? |
Where YUSHUNXIN fits
The UBC decoating line is confirmed at 2 to 8 tonnes per hour on a continuous rotary drum with UBC metal burn loss below 0.5%, and coated aluminium scrap at 1.5 to 6 tonnes per hour with three-stage PID control from 400 to 540 degrees Celsius. The furnace and its off-gas are supplied as one system, because splitting them across suppliers leaves the interfaces to be resolved on site, where changes cost the most.
Decoating procurement guide FAQ
Should I decoat before melting or charge coated scrap directly?
Decoating first keeps the coating from burning inside the melt furnace, where it becomes dross and complicates the off-gas. The confirmed UBC result is below 0.5% metal burn loss, and the wider benefit is a steadier furnace.
Continuous drum or batch oven?
Continuous drum for UBC and coated scrap at tonnes per hour; batch burn-off for hooks, fixtures and parts defined by size, weight and temperature limit. They are different duties, not interchangeable sizes of the same machine.
Does the off-gas belong in the furnace scope?
Yes. The furnace and its gas handling are one system. Sizing them together is the only way to know the recirculation loop, thermal oxidation duty and permit interface agree.
Related reading

Decoating Furnaces: Market and Competitors
UBC decoating versus hook burn-off, with the supplier map.

UBC Decoating Furnace: Buying Questions
Feed, coating, burn loss, energy and emission questions to ask first.

Thermal Decoating & Cleaning
The board covering UBC, coated scrap, hooks and industrial parts.