+86 182 0399 3035 [email protected] WhatsAppRequest a proposal

Controls & Automation

The control layer makes a recycling line repeatable: the electrical basis, PLC and SCADA architecture, safety interlocks and the operating data that follows.

A recycling line is only as good as its control layer. The electrical basis, the PLC and SCADA architecture, the safety interlocks and the operating data decide whether the line runs repeatably and whether problems are found before they become downtime.

Electrical basis and motor voltages

The line is built for the site's supply, with motor voltages selected for 380, 480 or 600 V systems as the project requires. Matching the electrical basis to the site avoids the transformer and drive mismatches that otherwise appear during installation. The electrical scope is confirmed with the utility demand and the motor list, so the delivered line plugs into the site rather than forcing the site to adapt.

PLC, SCADA and the control architecture

The control architecture uses Siemens or Schneider PLC platforms with DCS or SCADA supervision where the project calls for it. One interface supervises the whole route, whether that is discharge, shredding and separation on a battery line, or feed rate, temperature and off-gas on a decoating furnace. Keeping the architecture consistent across the three boards means an operator or maintenance team that knows one line can work on another, which shortens commissioning and reduces training.

Interlocks, data and operator experience

Safety interlocks span the stages so a fault in one stops the line safely rather than cascading. Operating data is collected from the same architecture, which is what supports the 72-hour continuous test on real material and the evidence a buyer needs to confirm performance. A good control layer is also an audit trail: it shows the inerting status, temperatures and alarms over time, which matters as much for the permit as for daily operation.

The audit trail also shortens troubleshooting. When an alarm or a deviation appears, the operator can trace the interlocks, temperatures and alarms that led up to it instead of guessing. That turns downtime into a diagnosed problem, and it gives the after-sales team the same record the operator is looking at. Consistent naming across the three boards means the same training and troubleshooting logic transfers between lines, which cuts the time a new operator needs to become productive. A shared record also makes audits quicker and after-sales support more precise, because everyone is reading the same data.

Controls and automation FAQ

Can the line integrate with our existing SCADA?

The control architecture is specified against the project, so existing SCADA or DCS systems are part of the scope discussion. Send the site voltage and control preferences and we will confirm how the line integrates with what you already run.

What operating data does the line record?

The control layer records the interlocks, temperatures, alarms and process states over time, which supports the continuous test on real material and gives the operator an audit trail for the permit. This is built into the architecture from the start.

Why match motor voltages to the site?

Motor voltages are selected for 380, 480 or 600 V systems as the project requires, which avoids transformer and drive mismatches that otherwise appear during installation and add cost and delay.

WhatsApp
Call WhatsApp Get a quote